You are not allowed to close up the walls and move onto the next phase of the project until this inspection happens. With electrical work, inspectors generally are scheduled for visits once the project is percent complete, and they will check the electrical panel, junction boxes, and outlets.
Note that sometimes, because of city bureaucracy and delays, your electrical inspection may be rescheduled two or three times.
Check with your contractor or architect about what your project requires. To prevent having to redo the floors if you decide to reconfigure your space in the future, make sure that the flooring is consistent throughout, even if some of it will be hidden. Install the kitchen, usually in this order: cabinets, appliances, fixtures and lighting, counters, backsplash, and cabinet hardware.
Install the bathroom, including the tub, vanity and sink, toilet, and any built-in shelving. Tiling, lighting, and hardware usually come last. In the hallways and bedroom, if you are doing basic painting and touch-ups, the work will be fairly minimal compared to the kitchen and bath.
If you are adding custom, built-in shelving or paneling, plan to add a few extra days. Possible delays: aspects of this may vary, depending on site conditions and the arrival time of the materials.
However, you may want to hire post-construction cleaning specialists to make sure that your new floor is clean enough to eat off.
For a full apartment, plan on requesting at least two cleaners to work at the same time so that it can be finished in one working day. The finish line is in sight! Review the work with your contractor: try all the drawers and doors, look closely at the edges and finishes, and make sure everything is working the way it should. If there are any problems, point it out and add them to the punch list. Instead, take notes of what needs fixing as you live in your new home. Depending on what the items are, this step could take anywhere from a day to several weeks.
It depends on the items left: are you straightening a cabinet door, or waiting on installing an out-of-stock item? Otherwise, your contractor should be able to return and fix everything in a few days. This timeline provides a detailed look at the various aspects of renovating and a range of how long each step should take. Apartment owners: you can have the laundry space of your dreams. Take it from these Sweeten renovators!
Sweeten matches home renovation projects with vetted general contractors, offering guidance and financial protection—at no cost to the homeowner. Both you and your clients will benefit when you refer them to renovate with Sweeten.
Learn more below. Apartment Renovation Timeline: Pre-Construction Phase While the attention is usually on the most visible construction phase, there is a lot to be done before then. Disruption scale: 2 Seems counter-intuitive, because turning unfinished space into extra living space requires all the finishes of a new addition -- electrical, flooring, wall surfaces, and insulation.
But the good news: Work is confined to a part of the house you rarely use. Contractors can enter and exit through the basement door if you have one , and noise and dust are easily confined. The biggest disruptions come from periodic electrical outages. Disruption scale: 1 Replacing your roof is one of the least inconvenient remodeling projects you can do. If noise bothers you, stick in your earbuds and listen to something soothing. Are you planning to build a new addition to your existing home?
Every planned change takes time to do right. This is one of those act-of-God things that can throw a wrench into the best-laid plans. Experience has taught us to leave some extra room in the schedule for the vagaries of fate, like out-of-the-blue storms and cold snaps.
Most builders and their teams are used to working through all kinds of weather. Sometimes, however, we are at the mercy of the elements, and need to make adjustments for variations such as:.
But some cities and states need to cope with huge swings of the thermometer which can totally change the timeline. When the temperature drops below freezing, it can affect the way paint dries or concrete hardens. Temperatures that stay over degrees for a long time can create their own problems. It's possible to continue working in the rain, but too much precipitation continuously falling from the sky for too long can stall a project, especially in the early stages of building a new addition.
If site work or landscaping is needed, extreme muddy conditions can slow down the bulldozers. Very wet conditions or flooding can compromise the pouring of the foundation or keep the framing from going up in time.
However, after the foundation is dried in and most of the work has moved indoors, it can rain all day and all night without affecting our schedule. When your builder has a super-organized and efficient office team handling the paperwork, you know that everything possible is being done to move the process along.
I know. This is the most stressful variable. As demolition begins, we sometimes find issues that cannot be ignored. Dealing with these problems can change the projected schedule. Some of the most common include:. A trustworthy building expert will have seen these kinds of issues before and will know how to handle them with minimal added time and expense. Sometimes, you change your mind. A good builder should be flexible enough to roll with it. However, you should be aware that design changes can delay the completion of your renovation project and can also be a serious budget-buster.
While there are many people on the home renovation team, including your architect, your builder, and the work crews, at the end of the day you are in charge. The right contractor is an expert and will give you all the benefit of their experience and advice, but they should also treat you as a full collaborator and a partner in the renovation.
While there are some variables that are out of your control during a home renovation, you should never give up your power in the situation. There are some very important things you can do to help your project stay on track.
Your builder is at the forefront of every aspect of your home renovation. If they have the experience, expertise, and trusted network of reliable subcontractors to execute your plans, you are more than halfway to a project that will be completed on schedule. Choose a builder who is organized, with proven processes, and who holds themselves accountable for tracking project schedules and budgets.